Sunroom SIPs are Complete

Today we finished applying the SIPs to the south facing sunroom (breakfast area), installed a french door, tarped the sunroof roof, and put down more standing seam metal on the upper south roof. All of today's progress is summarized by this single photograph. Everywhere it is feasible, we are trying to immediately follow the panels with roofing and windows - in order to avoid exposing the edges of the panels to very much sun or rain (foam insulation doesn't like UV and we all know that OSB edges don't like rain). We have been very fortunate so far with the weather, but rain is forecast for tomorrow. Posted by Picasa